Workout Splits

Push Pull Legs for Beginners: A Simple 3-Day PPL Plan

A simple 3-day Push Pull Legs programme for beginners, with exercises, sets, rep ranges, rest guidance and an easy progression method for each workout.

A simple 3-day Push Pull Legs programme for beginners, with exercises, sets, rep ranges, rest guidance and an easy progression method for each workout.

By Junaid Hussain

At a glance

Train Push, Pull and Legs on three separate days each week. Start with two working sets per exercise and practical rep ranges from 6–15 reps. Choose conservative starting weights and prioritise controlled, repeatable technique. Rest long enough to perform the next working set properly rather than rushing between sets. Build reps within the target range, then increase the weight and build again. Substitute similar exercises when necessary, but avoid changing movements constantly. If you miss a workout, continue the PPL sequence rather than cramming sessions together. A 3-day PPL gives each category one dedicated session per week; if you are undecided, a 3-day full-body routine is also worth considering.

On this page

  1. The 3-day PPL schedule

  2. Push workout

  3. Pull workout

  4. Legs workout

  5. What a completed week might look like

  6. Why does the programme start with two sets?

  7. How to choose your starting weights

  8. How hard should you train, and how long should you rest?

  9. How to progress the programme

  10. Can I substitute exercises?

  11. What if you miss a workout?

  12. Should you move to six-day PPL later?

  13. How long should you run the programme?

  14. How to track your PPL workouts

Push Pull Legs — usually shortened to PPL — organises resistance training into three types of workout. Push trains the chest, shoulders and triceps; Pull trains the back, rear shoulders and biceps; and Legs trains the lower body.

A simple three-day version looks like:

Monday — Push
Wednesday — Pull
Friday — Legs

Then you repeat the sequence the following week.

A 3-day PPL can be a straightforward beginner routine if you enjoy focused sessions and can follow the schedule consistently. There is one trade-off to understand before you start: at three sessions per week, Push, Pull and Legs each receive one dedicated workout before the sequence repeats. Current ACSM guidance recommends training all major muscle groups at least twice weekly as a general target, so if you have no preference and only want the simplest three-day structure, a full-body routine is also worth considering.

This guide assumes you have decided that you want to train with PPL. If you are still choosing, see Full Body vs Push Pull Legs for Beginners.

The 3-day PPL schedule

The 3-day PPL week

Mon

Push

Tue

Rest

Wed

Pull

Thu

Rest

Fri

Legs

Sat

Rest

Sun

Rest

You do not need these exact days. Tuesday, Thursday and Saturday would work just as well. Choose three training days you can attend consistently and leave enough recovery time that the schedule remains practical.

Push workout

The Push session combines a main chest press, additional pressing, shoulder work and tricep training without requiring several versions of the same movement.

Exercise

Working sets

Rep range

Guidance

Chest press or bench press

2

6–10

Choose a version you can perform consistently

Seated shoulder press

2

8–12

Dumbbells or a machine are both fine

Incline chest press

2

8–12

Dumbbells, machine or another stable incline variation

Lateral raise

2

10–15

Keep the movement controlled

Tricep pushdown

2

10–15

Cable or suitable machine variation

A machine chest press is completely acceptable for a beginner if it gives you a stable way to learn pressing and progress the load. The same principle applies throughout this programme: you do not need to choose the most technically demanding version of an exercise for it to be useful.

Pull workout

The Pull session uses one main vertical pull, one row, rear-shoulder work and direct bicep training.

Exercise

Working sets

Rep range

Guidance

Lat pulldown or assisted pull-up

2

8–12

Use a controlled, repeatable range of motion

Seated cable or chest-supported row

2

8–12

Choose one main row and learn it well

Rear-delt fly

2

10–15

Machine or cable variation

Bicep curl

2

10–15

Dumbbells, cable or machine

You do not need several pulldowns, several rows and four different curl variations in a beginner Pull workout. A smaller number of repeatable exercises gives you a clearer training history and makes progression easier to judge.

Legs workout

The Legs session combines a knee-dominant movement, a hip hinge and smaller lower-body exercises.

Exercise

Working sets

Rep range

Guidance

Leg press or squat variation

2

6–10

Choose a version you can perform confidently

Romanian deadlift or suitable hip-hinge alternative

2

8–12

Start conservatively and learn the movement

Leg curl

2

10–15

Seated or lying variation

Leg extension

2

10–15

Use a comfortable, consistent setup

Calf raise

2

10–15

Machine or another stable variation

A leg press or machine squat can be easier for a brand-new lifter to learn than a free-weight squat, but there is no requirement to use machines. ACSM’s current guidance emphasises that different forms of resistance training and equipment can be effective; exercise selection should fit the person rather than follow a rigid hierarchy of machines versus free weights.

What a completed week might look like

Your workout log records the reps you actually completed rather than simply copying the target ranges from the programme.

Workout note

Push

Chest press

50x10

50x9


Shoulder press

15x10

15x9


Incline press

20x11

20x10


Lateral raise

7.5x15

7.5x13


Pushdown

25x13

25x12

Workout note

Pull

Lat pulldown

50x11

50x10


Cable row

50x10

50x10


Rear-delt fly

25x15

25x13


Cable curl

20x12

20x11

Workout note

Legs

Leg press

120x10

120x9


RDL

60x10

60x9


Leg curl

35x13

35x11


Leg extension

40x14

40x12


Calf raise

60x15

60x13

The programme contains the target; your workout history contains the result. Those actual results are what you use when deciding what to attempt the next time the exercise appears.

Why does the programme start with two sets?

This is deliberately a manageable starting programme rather than a maximal-volume routine. Two working sets per exercise give a beginner useful practice and enough work to begin progressing without making every session unnecessarily large.

That does not mean two sets are uniquely optimal or that you should never do more. ACSM’s current guidance emphasises individualisation and gradual progression; for strength-oriented training it commonly points to 2–3 sets per exercise, while hypertrophy-oriented programming may use greater weekly volume.

The rep ranges follow the same principle. Larger movements use moderate ranges such as 6–10 or 8–12, while smaller isolation exercises use 10–15. These are practical ranges rather than physiological borders, and they do not need to be identical across every exercise.

How to choose your starting weights

During your first sessions, err on the side of starting too light rather than too heavy. Choose a load that lets you reach at least the lower end of the target range with controlled technique and without turning the final repetitions into a completely different movement.

For a chest press programmed at 2 × 6–10, you do not need to find the heaviest weight you can possibly lift six times on day one. A first result such as:

40x8
40x8

with stable technique gives you something useful to build from.

If you complete the top of the range very easily, increase the weight slightly next time. If you cannot reach the bottom of the range with reasonable technique, reduce it. The first week is partly about establishing sensible starting loads; you do not need to get every number perfect immediately.

How hard should you train, and how long should you rest?

Your working sets should feel challenging, but you do not need to take every set to the point where another repetition is physically impossible. Current ACSM guidance finds that training to momentary failure is not consistently necessary for strength or muscle growth in the average healthy adult.

Prioritise controlled repetitions and a repeatable range of motion. The final part of a working set should require real effort, but if technique deteriorates badly, forcing another rep simply to make the log look better is not useful progression.

For rest, around two minutes is a reasonable starting point for many exercises, with longer rests when a demanding movement leaves you unable to perform the next working set properly. Smaller exercises such as lateral raises, curls and pushdowns may need less. Evidence in untrained lifters suggests short-to-moderate rest intervals can support strength gains, while longer rests can help preserve performance as training demands increase.

Do not treat the rest timer as a test. The purpose of resting is to make the next working set useful.

How to progress the programme

Use a simple rep-range progression system. Suppose chest press is programmed as:

2 × 6–10

and you begin with:

50x8
50x7

Over subsequent Push workouts, the result might become:

50x9
50x8

then:

50x10
50x9

and eventually:

50x10
50x10

Once you reach the top of the range across the prescribed working sets, make a small practical increase in weight. Your next workout might be:

55x8
55x7

and you begin building the repetitions again.

Chest press through 2 × 6–10

50x8,7

Start

50x10,9

Building

50x10,10

Top of range

55x8,7

Increase

Reach the top of the range across both sets, then make a small practical increase.

This is simple double progression. You are not required to add weight every week; improving reps at the same load is also progress. See Progressive Overload for Beginners: When to Add Reps or Weight for the fuller explanation.

If the next available weight is a large jump — common with dumbbells and machine stacks — do not force it prematurely. Keep building reps, use smaller increments where available, or accept a temporary reduction in reps if the heavier load still keeps you inside the programme.

Can I substitute exercises?

Yes. The programme structure matters more than one exact machine.

A chest press can be replaced by another suitable press, a lat pulldown by an assisted pull-up or another vertical pull, and a cable row by a chest-supported or machine row. The same principle applies to lower-body movements.

Try to keep a replacement stable once you choose it. Constantly changing exercises for novelty makes it harder to compare sessions and tell whether you are actually progressing.

If an exercise causes pain that concerns you, do not keep forcing it simply because it appears in the template. Adjust the setup or choose an appropriate alternative, and seek qualified individual guidance if the problem persists or you are unsure how to modify the exercise. Resistance training should be individualised around ability and safety rather than rigidly preserving one movement. citeturn315127view0

What if you miss a workout?

Continue the sequence rather than trying to cram the missed workout into whatever day comes next.

If you planned:

Monday — Push
Wednesday — Pull
Friday — Legs

but missed Wednesday, you might perform Pull on Friday and Legs at your next available session. The weekday labels are less important than preserving a sensible sequence.

If missed sessions happen regularly, the problem may be the structure rather than your motivation. A three-day PPL depends more heavily on attending each session because each category receives only one dedicated workout before the sequence repeats; a full-body routine is more forgiving when your available training days are unreliable.

Should you move to six-day PPL later?

Not automatically.

A common higher-frequency PPL schedule is:

The six-day PPL week

Mon

Push

Tue

Pull

Wed

Legs

Thu

Push

Fri

Pull

Sat

Legs

Sun

Rest

but that doubles the number of scheduled gym sessions and can substantially change your total training workload. More days are not a badge of progression.

Stay with three days while it suits your schedule, performance and recovery. Move to a higher-frequency programme only when you have a reason to do so, not because you have completed an arbitrary number of weeks.

How long should you run the programme?

There is no need to replace the routine after four, six or eight weeks simply for novelty. If you are attending consistently, improving your performance, recovering adequately and becoming more confident with the exercises, the programme is still doing something useful.

Consider changing it when your schedule or goals change, important exercises repeatedly stop suiting you, your recovery becomes difficult to manage, or the structure no longer gives you an appropriate way to progress.

A programme does not expire because it has become familiar.

How to track your PPL workouts

Before repeating an exercise, check the previous time you performed it. Look at the weight, completed reps, target range and any note that changes how you should interpret the result.

For example:

Chest press

50x10, 50x9

Last Push

50x10, 50x10

Today

Increase weight slightly

Next Push

Target: 6–10

That turns a static exercise list into a progressive programme.

HyperResponder can keep the PPL routine saved as a programme while you record what actually happened in shorthand. The important question stays simple: what did I do last time, and what am I trying to improve today?

If your log can answer that, the programme has something useful to build on.

This programme is intended as general information for generally healthy adult beginners. Exercise selection and training load should be adapted to your ability and circumstances. If you have an injury, medical condition or another reason exercise may require modification, seek individual guidance from an appropriately qualified professional.

In the app

Log this the easy way

Programs

Type your workout as a plain note — HyperResponder turns it into structured sets, reps and weight, and tracks your progress from there.

Bench press 3x8 60kg
Row 3x10 50kg
Felt strong, add 2.5kg next week

Bench press 3x8 60kg
Row 3x10 50kg
Felt strong, add 2.5kg next week

Stop guessing. Start logging.

Stop guessing. Start logging.

Take what you’ve learned into the gym. Log your next session as a plain note and let HyperResponder handle the structure.